Start of construction of three Vestas wind turbines (V136 & 2x V150)

25.02.2019

The road construction work for the erection of three Vestas wind turbines in Brandenburg has begun. A V136 with a rated output of 3.6 megawatts and a hub height of 132 meters and two V150 with 4.2 megawatts and a hub height of 123 meters are being built here.