Skip to content
Notus im Radio
  • Home
  • News
  • Germany: Commissioning of 3x Vestas

Commissioning of Waldow VI wind farm

Two Vestas V80 turbines at our first wind farm in Waldow were replaced by three more powerful and modern turbines. Two Vestas V150 turbines with 5.6 and 6.0 megawatts and one V162 with 5.6 megawatts were installed. All three turbines have a hub height of 169 meters and together produce approximately 135,500 kWh of green electricity.

Picture